At present, the apartment still looks drab and grey but it's nothing that a fresh coat of paint and electrical lighting cannot fix.
Work in progress: the tiler and contractor's work stuff are still strewn all over the place. Walls and ceiling had been made smooth via plastering of ultra hard compound.
The dividing wall between the living room and the kitchen had been pushed back to make both places more optimally functional. The stiffener (protruding beam across the living room ceiling) marks where the divider wall used to be and it will be covered up by the false ceiling.
The new windows serves to throw more light into the kitchen and make the space appear bigger and they also better ventilate the apartment.
The apartment really looks "industrial" with grey tiles and grey walls. Me like ;)
No more dingy kitchen toilet!
The future office. Nothing much done except wall/ceiling plastering and installation of new windows.
The master-bedroom work in progress, the master bathroom had been extended out.
The future walk-in-wardrobe
We had lots of showflat inspiration and a contractor who's a "toilet specialist", the toilet better turn out good! =P
No comments:
Post a Comment